Petroleum Cleanup Phase and Cleanup Activity Table Sample Clauses

Petroleum Cleanup Phase and Cleanup Activity Table. Cleanup Phase Cleanup Activity Abbreviation Source Removal (SR) Contaminated Soil Removal (CSR) SR-CSR Free Product Recovery (FPR) SR-FPR Site Assessment (SA) Site Characterization Screening (SCS) SA-SCS Reconnaissance (REC) SA-REC Initial Site Assessment (ISA) SA-ISA Site Assessment (SA) SA-SA Supplemental Site Assessment (SSA) SA-SSA Site Closure (SC) SA-SC Well Abandonment That is Not Part of Site Closure (WA) SA-WA Remedial Action (RA) Natural Attenuation Monitoring Plan (NAP) RA-NAP Natural Attenuation Monitoring (NAM) RA-NAM Long Term Natural Attenuation Monitoring (LTNAM) RA-LTNAM Supplemental Site Assessment (SSA) RA-SSA Pilot Test (PT) RA-PT Limited Scope Remedial Action Plan (LSRAP) RA-LSRAP Remedial Action Plan (RAP) RA-RAP Remedial Action Modification Plan (MOD) RA-MOD Contaminated Soil Removal (CSR) RA-CSR Free Product Recovery (FPR) RA-FPR Limited Scope Remedial Action (LSRA) RA-LSRA Remedial Action Construction (RAC) RA-RAC Operation & Maintenance (O&M) RA-O&M Post Active Remediation Monitoring (PRM) RA-PRM Site Closure (SC) RA-SC Well Abandonment That is Not Part of Site Closure (WA) RA-WA Performance-Based Cleanup (PBC) Any Applicable Cleanup Codes Above Verification Sampling (VS) PBC-(code) PBC-VS
AutoNDA by SimpleDocs

Related to Petroleum Cleanup Phase and Cleanup Activity Table

  • First sampling In the first sampling four lamps are selected at random. The first sample of two is marked A, the second sample of two is marked B.

  • Environmental Assessment and Mitigation Development of a transportation project must comply with applicable environmental laws. The party named in article 1, Responsible Parties, under AGREEMENT is responsible for the following:

  • PHASE is a distinct portion of the Work to be provided under this Agreement, as specified in the Statement Of Work.

  • REVERSE ENGINEERING & SECURITY You agree not to undertake any of the following actions:

  • Evaluation Cycle: Formative Assessment A) A specific purpose for evaluation is to promote student learning, growth and achievement by providing Educators with feedback for improvement. Evaluators are expected to make frequent unannounced visits to classrooms. Evaluators are expected to give targeted constructive feedback to Educators based on their observations of practice, examination of artifacts, and analysis of multiple measures of student learning, growth and achievement in relation to the Standards and Indicators of Effective Teaching Practice.

  • Phase 2 Phase 2 is expected to consist of Member Nodes and a select number of Nodes operated by non-Members. The non-Member Nodes will be required to comply with Node hosting terms as set forth by the Council, which may be amended from time to time (the “General Node Terms”).

  • Phase II A small portion of the work for the Phase II modifications to the Plattsburgh Substation will be performed by Transmission Owner, and the remainder will be performed by Clinton and Xxxxxxxxx. A detailed definition of the specific scope for Transmission Owner and Clinton and Xxxxxxxxx including interface points shall be defined during the design phase and, as such documents become available, copies will be delivered to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The full scope includes the installation of wave traps, CCVT’s and modifications and/or additions to relaying on the MWP-1 and MWP- 2 lines. These lines will be reconfigured at the completion of Phase II to connect to Xxxxx and Xxxxxxx Substations on MWP-1 and the Xxxx Substation on MWP-2. Clinton and Xxxxxxxxx will design the upgrades and purchase the materials based on the outline specification that was prepared and issued by Transmission Owner. The work to be performed by Clinton and Xxxxxxxxx will include both the materials for the exterior and interior installations and items for Transmission Owner installation inside the control building in existing relay panels and communication racks. In addition, Clinton and Xxxxxxxxx will be responsible for the exterior and interior construction work and will provide construction management services in coordination with Transmission Owner. The civil design for the foundations and the electrical design for the cable runs to the control room will be designed by, as approved by Transmission Owner, and installed under the supervision and control of Clinton and Xxxxxxxxx. The equipment will be selected and procured in accordance with the specifications developed during the detailed engineering phase, copies of which shall be furnished to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The construction of the foundations, structures, wave traps, CCTV and cable runs into the control building to the termination cabinets will be completed by Clinton and Xxxxxxxxx. The work at the Plattsburgh Substation will be installed under Transmission Owner’s CPP-1. Transmission Owner will provide Protection and Controls Engineering, install and terminate wiring from the termination cabinets to the control panels and relays, install relays and equipment in the existing panels, and will commission such work inside the 230kV control building. Transmission Owner will develop the communications protocols and data flow over the circuits.

  • Phase I a. In Phase I, the project will be connected as a tap to the Transmission Owner’s 230kV transmission line MWP-2 via one 230kV circuit breaker in series with one of two ring bus breakers for stuck breaker protection (one in each direction) and a tie-line breaker, as shown on the one-line diagram labeled CL-E-IA-01 attached to this Appendix A as Figure 1. The changes to the existing MWP-2 line protection for this arrangement are described in Phase I System Upgrades in Section II of this Appendix A.

  • Environmental Tobacco Smoke Public Law 103-227 (also known as the Pro-Children Act of 1994) and Vermont’s Act 135 (2014) (An act relating to smoking in lodging establishments, hospitals, and child care facilities, and on State lands) restrict the use of tobacco products in certain settings. Party shall ensure that no person is permitted: (i) to use tobacco products or tobacco substitutes as defined in 7 V.S.A. § 1001 on the premises, both indoor and outdoor, of any licensed child care center or afterschool program at any time; (ii) to use tobacco products or tobacco substitutes on the premises, both indoor and in any outdoor area designated for child care, health or day care services, kindergarten, pre-kindergarten, elementary, or secondary education or library services; and (iii) to use tobacco products or tobacco substitutes on the premises of a licensed or registered family child care home while children are present and in care. Party will refrain from promoting the use of tobacco products for all clients and from making tobacco products available to minors. Failure to comply with the provisions of the federal law may result in the imposition of a civil monetary penalty of up to $1,000 for each violation and/or the imposition of an administrative compliance order on the responsible entity. The federal Pro-Children Act of 1994, however, does not apply to portions of facilities used for inpatient drug or alcohol treatment; service providers whose sole source of applicable federal funds is Medicare or Medicaid; or facilities where Women, Infants, & Children (WIC) coupons are redeemed.

  • Joint Funded Project with the Ohio Department of Transportation In the event that the Recipient does not have contracting authority over project engineering, construction, or right-of- way, the Recipient and the OPWC hereby assign certain responsibilities to the Ohio Department of Transportation, an authorized representative of the State of Ohio. Notwithstanding Sections IV, VI.A., VI.B., VI.C., and VII of the Project Agreement, Recipient hereby acknowledges that upon notification by the Ohio Department of Transportation, all payments for eligible project costs will be disbursed by the Grantor directly to the Ohio Department of Transportation. A Memorandum of Funds issued by the Ohio Department of Transportation shall be used to certify the estimated project costs. Upon receipt of a Memorandum of Funds from the Ohio Department of Transportation, the OPWC shall transfer funds directly to the Ohio Department of Transportation via an Intra-State Transfer Voucher. The amount or amounts transferred shall be determined by applying the Participation Percentages defined in Appendix D to those eligible project costs within the Memorandum of Funds. In the event that the Project Scope is for right-of-way only, notwithstanding Appendix D, the OPWC shall pay for 100% of the right-of-way costs not to exceed the total financial assistance provided in Appendix C. APPENDIX D LOCAL SUBDIVISION CONTRIBUTION, PROJECT FINANCING AND EXPENSES SCHEME AND DISBURSEMENT RATIO

Time is Money Join Law Insider Premium to draft better contracts faster.