Detailed Construction Program Sample Clauses

Detailed Construction Program. The bidder / contractor shall furnish his construction program for non-monsoon and monsoon periods separately on the basis of actual assessment of quantities duly backed with complete equipment mobilization and deployment thereof on works along with broad calculations to justify his capacity to achieve completion of works. Submission of the above construction program is mandatory. The construction program along with material management / procurement program shall be given in complete detail showing name of his technical person in-charge having degree or diploma in Civil Engineering for each components of work and other responsible personnel’s involved thereon. The list of proposed equipment for each system with labour component (skilled/semi-skilled/un-skilled) shall be given in detail. The justification/calculation will have to be given for executing the works as per the construction program, separately for each work.
AutoNDA by SimpleDocs
Detailed Construction Program. The bidder / contractor shall furnish his construction program for non-monsoon and monsoon periods separately on the basis of actual assessment of quantities duly backed with complete equipment mobilization and deployment thereof on works along with broad calculations to justify his capacity to achieve completion of works. Submission of the above construction program is mandatory. The construction program along with material management / procurement program shall be given in complete detail showing name of his technical person in-charge having degree or diploma in Civil Engineering for each components of work and other responsible personnel’s involved thereon. The list of proposed equipment for each system with labour component (skilled/semi-skilled/un-skilled) shall be given in detail. The justification/calculation will have to be given for executing the works as per the construction program, separately for each work. Methodology of Work: The works under the contract comprises of Rehabilitation and modernization of "Balance work of Restructuring and Modernization of Siloda Tank and Their Canal Systems" The rehabilitation of dam involves concreting, relaying of pitching where ever disturbed, The Rehabilitation of canal includes re-sectioning to bring them to design profile, lining in initial reach and near structures, repair of old structures and construction of new structures.

Related to Detailed Construction Program

  • Phased Construction The Construction Manager shall provide recommendations with regard to accelerated or fast-track scheduling, procurement, or phased construction. The Construction Manager shall take into consideration cost reductions, cost information, constructability, provisions for temporary facilities and procurement and construction scheduling issues.

  • Construction Progress Schedule A schedule indicating proposed activity sequences and durations, milestone dates for receipt and approval of pertinent information, preparation, submittal, and processing of Shop Drawings and Samples, delivery of materials or equipment requiring long-lead time procurement, and proposed date(s) of Material Completion and Occupancy and Final Completion. The schedule will be developed to represent the sixteen or seventeen CSI Specification Divisions. It shall have a minimum number of activities as required to adequately represent to Owner the complete scope of work and define the Project’s critical path and associated activities. If the Project is to be phased, then each individual Phase should be identified from start through completion of the overall Project and should be individually scheduled and described, including any Owner’s occupancy requirements and showing portions of the Project having occupancy priority. The format of the schedule will have dependencies indicated on a monthly grid identifying milestone dates such as construction start, phase construction, structural top out, dry-in, rough-in completion, metal stud and drywall completion, equipment installation, systems operational, Material Completion and Occupancy Date, final inspection dates, Punchlist, and Final Completion date.

  • Project Construction Budget The project construction cost allowance specifically stated in writing as the ‘revised’ or ‘current’ ‘Project Construction Budget’ by the Trustees at each applicable phase of plan development.

  • ADDITIONAL CONSTRUCTIONS The Promoter undertakes that it has no right to make additions or to put up additional structure(s) anywhere in the Project after the building plan has been approved by the competent authority(ies) except for as provided in the Act.

  • Project Construction The Contractor agrees to provide continuous on-site supervision on each Job Order, while progress on the project is being accomplished. The Contractor’s Project Manager will ensure:

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Definitions and Construction 1 1.1 Definitions.....................................................................................1 1.2

  • ADDITIONAL CONSTRUCTION The Promoter undertakes that it has no right to make additions or to put up additional structure(s) anywhere in the Project after the building plan has been approved by the competent authority (ies) except for as provided in the Act.

  • Design and Construction In complying with the requirements of the specification both with respect to arrangement and detail, design is to conform to the best current engineering practice. Each of the several parts of the material is to be of the maker’s standard design provided that this design is in general accordance with the specification. The essence of design should be simplicity and reliability in order to give long continuous service with high economy and low maintenance cost. Particular attention should be paid to internal and external access in order to facilitate inspection, cleaning and maintenance. The design dimensions and materials of all parts are to be such that they will not suffer damage as a result of stresses under the most severe conditions. Fully detailed specifications of the several parts of the material are to be submitted describing particularly the materials to be used. The materials used in the construction of the material are to be of the highest quality and selected particularly to meet the duties required of them. Mechanisms are to be constructed to avoid sticking due to rust or corrosion. Workmanship and general finish are to be of the highest class throughout. All similar parts of the material are to be interchangeable. All equipment is to operate without undue vibration and with the least possible amount of noise and is not to cause a nuisance. All equipment is to be designed to minimize the risk of fire and any damage, which may be caused in the event of fire. The equipment is also to be designed to prevent ingress of all vermin, accidental contact with live parts and to minimize the ingress of dust and dirt. The use of materials, which may be liable to attack by termites or other insects, is to be avoided.

  • BUILDER’S RISK FOR NEW CONSTRUCTION PROJECTS If the project is NEW CONSTRUCTION, then the following provisions apply: