Bus Work Sample Clauses

Bus Work. The 69kV low bus will be extended to the west. The new 69kV main bus will be 3” Al with 1192 Al wire taps. The wire taps to all PT’s and arresters will be 336 Al.
AutoNDA by SimpleDocs
Bus Work. The 69kV low bus will be extended to the west. The new 69kV main bus will be 3” Al with 1192 Al wire taps. The wire taps to all PT’s and arresters will be 336 Al. Control House – Three (3) new control panels will be installed in the west end of the control house. The new AC supply cable to GCB 6050 will come from a single pole 30A breaker on AC Dist Panel C. Control Cables – The following new cables will be installed. These will be installed from the control house to the new equipment via the existing precast concrete trench and new conduits. Control House to GCB 6050 Two (2) 19/c #12 control cables Two (2) 9/c #9 CT cables One (1) 2/c #10 AC Revenue metering panel at the LIPA 8ER Brookhaven Substation control house to metering CTs and PTs substation structure One (1) 10c/#9 awg metering secondary cable Metering CTs and PTs secondary wiring on metering transformer substation structure One (1) 10c/#9 awg metering secondary cable Miscellaneous – 48kV MCOV surge arresters will be located 18” from the insulators on the pothead structure. One (1) spline ball will be installed. All new equipment will be connected to the existing ground grid according to LIPA’s construction standards.
Bus Work. ➢ (3) 115 kV, Station Post Insulators ➢ (6) 230 kV, Station Post Insulators ➢ (180) Feet – 336.4 MCM ACSR ➢ (9) 2” Aluminum Pipe Bus Supports to 5’ B.C. ➢ (180) Feet – 2” SPS Aluminum Pipe Bus
Bus Work. ➢ (18) 115 kV Composite Deadend Insulators ➢ (450) Feet – 336.4 MCM ACSR ➢ (1) 121 kV Station Post Insulators
Bus Work. Not applicable.

Related to Bus Work

  • Struck Work 4.01 While this agreement is in force, no strike or lockout will take place.

  • Shift Work Shift work is work not in excess of ordinary hours (ie 38 hours per week), but carried out wholly or partly between the hours of 7.00pm and 7.00am, Monday to Friday. Shift work is work scheduled at least 24 hours prior to the commencement of the shift. Employees required to work shift work will be paid at time and one quarter of the ordinary rate per hour for ordinary hours worked.

  • Day Work (a) The normal work week shall be thirty-seven and one-half (37½) hours and the normal work day shall be seven and one-half (7½) consecutive hours, exclusive of a meal period, between the hours of 6:00 a.m. and 6:00 p.m. The normal work week shall be Monday to Friday inclusive.

  • Project Work PURCHASER shall complete the following projects in accordance with the specifications provided in Exhibits B, C, D, E, and F and written instructions from STATE. Project locations are shown on Exhibit A unless otherwise described. PURCHASER shall furnish all material unless otherwise specified.

  • Extra Work At any time during the Term of this Agreement, City may request that Consultant perform Extra Work. As used herein, “Extra Work” means any work which is determined by City to be necessary for the proper completion of the Project, but which the Parties did not reasonably anticipate would be necessary at the execution of this Agreement. Consultant shall not perform, nor be compensated for, Extra Work without written authorization from City’s Representative.

  • Finishing Work It has been clearly understood by the Alottee, that the Occupancy Certificate/Completion Certificate, as the case may be, are issued by the concerned authorities, when the entire civil construction work of the apartment is complete and the apartment is in a habitable state, however, to prevent any loss or damage, the internal fittings, furnishings and finishing work is done after obtaining completion certificate/occupancy certificate as the case may be. Further the internal fittings, furnishings and finishing work may also depend upon the choice of the Allottee. Therefore to ensure that there is no loss or damage to the internal fittings, furnishings and finishing work and the same may be carried on as per the choice of the Allottee, internal works such as fitting of switch boards, doors, sanitary fittings, plumber fittings like water taps/showers etc., final colour coat on the internal walls, floor tiles or any other internal work of like nature, shall be completed after obtaining occupancy certificate/completion certificate and before handing over the possession of the apartment to the Allottee.

  • Completion of Work Contractor is accountable for completing the Work within the Contract Time stated in the Contract, or as otherwise amended by Change Order.

  • STOP WORK (a) SELLER shall stop Work for up to ninety (90) days in accordance with any written notice received from LOCKHEED XXXXXX, or for such longer period of time as the parties may agree and shall take all reasonable steps to minimize the incurrence of costs allocable to the Work during the period of Work stoppage.

  • THE WORK The Work comprises the completed construction required by the Contract Documents and includes all labor necessary to produce such construction, and all materials and equipment incorporated or to be incorporated in such construction.

  • Additional Work If changes in the work seem merited by Consultant or the City, and informal consultations with the other party indicate that a change is warranted, it shall be processed in the following manner: a letter outlining the changes shall be forwarded to the City by Consultant with a statement of estimated changes in fee or time schedule. An amendment to this Agreement shall be prepared by the City and executed by both Parties before performance of such services, or the City will not be required to pay for the changes in the scope of work. Such amendment shall not render ineffective or invalidate unaffected portions of this Agreement.