Technical Acceptance Flight definition

Technical Acceptance Flight as defined in Clause 8.1.2(iv). Technical Acceptance Process – as defined in Clause 8.1.1.
Technical Acceptance Flight as defined in Clause 8.1.2(iv). Technical Acceptance Process – as defined in Clause 8.1.1. *** Confidential Treatment Requested Technical Data – as defined in Clause 14 and Exhibit F. Termination Event – as defined in Clause 21.1. Third Quarter or 3rd Quarter or 3Q – July, August and September of any given calendar year.

Examples of Technical Acceptance Flight in a sentence

  • Taxes – as defined in Clause 5.5.3. Technical Acceptance Flight – as defined in Clause 8.1.2. *** Confidential Treatment Requested Technical Acceptance Process – as defined in Clause 8.1.1. Technical Data - as defined in Clause 14 and Exhibit F.

Related to Technical Acceptance Flight

  • Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).

  • technical specification means a document that prescribes technical requirements to be fulfilled by a product, process or service;

  • Acceptance Tests means those tests performed during the Performance Period which are intended to determine compliance of Equipment and Software with the specifications and all other Attachments incorporated herein by reference and to determine the reliability of the Equipment.

  • Acceptance Test is a test of the Features executed by the Customer to prepare the acceptance.

  • Acceptance Testing mean the tests, reviews and other activities that are performed by or on behalf of Agency to determine whether the Deliverables meet the Acceptance Criteria or otherwise satisfy the Agency, as determined by the Agency in its sole discretion.

  • Technical Specifications means the detailed requirements for the Work furnished by the Architect and set forth in Book 3 of the Contract Documents.

  • Final Acceptance Date means, in respect of any Offer, the final date for acceptance of such Offer which, if such Offer is extended prior to becoming unconditional, shall be the final date for acceptance of the extended Offer (but, if such Offer is or becomes unconditional, disregarding any additional or further period during which such Offer is open for acceptance);

  • Final Acceptance means final written acceptance of all the Work by the Commissioner, a copy of which shall be sent to the Contractor.

  • Operational Acceptance means the acceptance by the Procuring Entity of the Facilities (or any part of the Facilities where the Contract provides for acceptance of the Facilities in parts), which certifies the Contractor's fulfillment of the Contract in respect of Functional Guarantees of the Facilities (or the relevant part thereof) in accordance with the provisions of GCC Clause 28 (Functional Guarantees) hereof and shall include deemed acceptance in accordance with GCC Clause 25 (Commissioning and Operational Acceptance) hereof.

  • technical service means an organisation or body designated by the approval authority of a Member State as a testing laboratory to carry out tests, or as a conformity assessment body to carry out the initial assessment and other tests or inspections, on behalf of the approval authority, it being possible for the approval authority itself to carry out those functions;

  • Design-build team means an entity that consists of:

  • Synchronous Optical Network (SONET) is an optical interface standard that allows inter-networking of transmission products from multiple vendors. The base rate is 51.84 Mbps (“OC-1/STS-1”) and higher rates are direct multiples of the base rate, up to 13.22 Gbps.

  • Interconnection Activation Date means the date that the construction of the joint facility Interconnection arrangement has been completed, trunk groups have been established, joint trunk testing is completed and trunks have been mutually accepted by the Parties.

  • Statement of Work means the description of activities performed in completing the Project, as specified in the Contract and as may be amended.

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • Acceptance Criteria means the Specifications, goals, performance measures, testing results and/or other criteria designated by the Agency and against which the Deliverables may be evaluated for purposes of Acceptance or Non-acceptance thereof.

  • Completion of work means completion of the entire contracted work. Exhaustion of quantity of any particular item mentioned in the bid document shall not imply completion of work or any component thereof.

  • Synchronous Optical Network (SONET means the optical interface standard that allows inter-networking of transmission products from multiple vendors. The base rate is 51.84 Mbps (“OC 1/STS 1”) and higher rates are direct multiples of the base rate, up to 13.22 Gbps.

  • Programme of work means the Programme of work submitted by the contractor and approved by the Engineer-in-charge and includes an amendment thereto made from time to time and approved by the Engineer-in-charge;

  • Functional Specifications means the descriptions of features and functions of the Application as expressly set forth in Quote.

  • Scope of Work means the description of Services and Deliverables specified in the Contract and as may be amended.

  • Ferry Flight means the movement of an aircraft without payload to position the aircraft to perform a flight or upon completion of a flight to position the aircraft to a point required by the carrier.