Railroad Construction definition

Railroad Construction work is defined as including, grading, drainage, placing of rails, crossties, ballast and the construction of bridges, and other incidentals for railroads, street railways construction projects and rapid transit system projects, but shall not include the construction of buildings.
Railroad Construction work is defined as including grading, drainage, placing of rails, crossties, ballast and the construction of bridges, and other incidentals for railroads, street railway construction projects and rapid transit system projects.
Railroad Construction work is defined as new con- struction including grading, drainage, placing of rails, crossties, ballast and the construction of bridges and other incidentals for railroads, street railways construction projects and rapid transit system projects, but shall not include the construction of buildings.

Examples of Railroad Construction in a sentence

  • It is mutually agreed that the parties signatory to this Agreement do hereby mutually subscribe to the "Railroad Construction Agreement" when the work awarded pertains to construction of railroad work.

  • FOR THE EMPLOYER: Construction Limited ________________ ________________ X.X. Xxxxxxx OWS Railroad (PRINT NAME) Lacroix Railroad Violin Railroad Accurate Railroad Construction Co. Inc.

  • Accurate Railroad Construction Limited FOR THE EMPLOYER: Violin Railroad Construction Co. Inc.

  • Xxxxxx Engineering & Consulting Bridgefarmer & Associates CONSTRUCTION CONTRACTORS Xxxxxx Transit Services Koppers Railroad Structures E80 Plus Constructors RailWorks Track System M&M Sales & Service COLO Railroad Builders Queen City Railroad Construction Lone Star Railroad Contractors Balfour Xxxxxx X X Xxxxxx Delta Railroad Construction Atlas Railroad Construction, LLC Osmose Railroad Services, Inc.

  • Provided further, that the Union shall be given five (5) working days notice of the signatory contractor’s intention to bid such project, and then, should a difference of opinion arise pertaining to the scope of work on such project, the difference of opinion shall be settled in accordance with Article 10 of the current Indiana Highway, Heavy, and Railroad Construction Agreement.

  • In the above instances, it shall be the duty of the contractor to notify the regional offices of the Laborers' International Union of North America, under whose jurisdiction the work is to be performed, when they are low bidder on a "Chimney Job" or a "Railroad Construction" job for the purpose of holding a pre-job conference covering that particular job.

  • In the above instances, it shall be the duty of the Contractor to notify the regional offices of the Laborers' International Union of North America, under whose jurisdiction the work is to be performed when they are low bidder on a "Chimney Job" or a "Railroad Construction Job" for the purpose of holding a pre-job conference covering that particular job.

  • If the Project is approved, Union Pacific will continue to work with Fresno COG to develop Final Plans, Specifications and prepare Material and Cost Estimates for Railroad Construction Work associated with the project.

  • Accurate Railroad Construction Limited ________________________ ________________________ (PRINT NAME) FOR THE EMPLOYER: Violin Railroad Construction Co. Inc.


More Definitions of Railroad Construction

Railroad Construction work is defined as new construc- tion including grading, drainage, placing of rails, crossties, ballast and the construction of bridges and other incidentals for railroads, street railways construction projects and rapid transit system projects, but shall not include the construction of buildings.
Railroad Construction work is defined as including drainage, and the construction of bridges and other incidentals for railroads, street railways construction projects and rapid transit system projects, but shall not include the construction of buildings.

Related to Railroad Construction

  • New construction means, for the purposes of determining insurance rates, structures for which the "start of construction" commenced on or after the effective date of an initial FIRM or after December 31, 1974, whichever is later, and includes any subsequent improvements to such structures. For floodplain management purposes, "new construction" means structures for which the "start of construction" commenced on or after the effective date of the floodplain management regulations adopted by a community and includes any subsequent improvements to such structures.

  • The constructional plant means all appliances, tools, plants or machinery or whatsoever nature required in or about the execution, completion or maintenance of the works but does not include materials or other things intended to form part of the permanent work.

  • Existing construction means any structure for which the "start of construction" commenced before the effective date of the initial floodplain management code or ordinance adopted by the community as a basis for that community's participation in the NFIP.

  • Pipeline Construction means a substantial disturbance to agricultural land associated with installation, replacement, removal, operation or maintenance of a pipeline, but shall not include work performed during an emergency. Emergency means a condition where there is clear and immediate danger to life or health, or essential services, or a potentially significant loss of property. When the emergency condition ends, pipeline construction will be in accordance with these rules.

  • Commenced Construction means (a) all of the following site preparation work is completed: ingress and egress routes exist; the site on which the Project will be located is cleared and graded; there is power service to the site; footings are prepared; and foundations have been poured consistent with purchased equipment specifications and project design; or (b) the following financial commitments have been made: (i) (A) an engineering, procurement, and construction contract (“EPC”) has been executed by all parties and is effective; or (B) contracts (collectively, “EPC Equivalents”) for all of the following have been executed by all parties and is effective: (1) project engineering, (2) procurement of all major equipment, and (3) construction of the Project, and (ii) the cumulative payments made by the Developer under the EPC or EPC Equivalents to the counterparties to those respective agreements is equal to at least thirty (30) percent of the total costs of the EPC or EPC Equivalents.

  • Commence Construction means that an owner or operator has either undertaken a continuous program of construction or has entered into a contractual obligation to undertake and complete, within a reasonable time, a continuous program of construction.

  • Start of construction means the date the development permit was issued, provided the actual start of construction, repair, reconstruction, or improvement was within 180 days of the permit date. The actual start means the first placement of permanent construction of the structure such as the pouring of slabs or footings, installation of piles, construction of columns, or any work beyond the stage of excavation, and includes the placement of a manufactured home on a foundation. (Permanent construction does not include initial land preparation, such as clearing, grading and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footings, piers or foundations or the erection of temporary forms; nor does it include the installation on the property of buildings appurtenant to the permitted structure, such as garages or sheds not occupied as dwelling units or part of the main structure. (NOTE: accessory structures are NOT exempt from any ordinance requirements) For a substantial improvement, the actual start of construction means the first alteration of any wall, ceiling, floor, or other structural part of a building, whether or not that alteration affects the external dimensions of the building.

  • Commencement of Construction means the initial disturbance of soils associated with clearing, grading, or excavating activities or other construction activities.

  • Completion of Construction means the date, as determined by the Division after consultation with the Recipient, that the work of building and erection of the Project is substantially complete.

  • construction site means a workplace where construction work is being performed;

  • Constructional Plant means all appliances or things whatever nature required in or about the execution, completion or maintenance of the works or temporary works (as hereinafter defined) but does not include materials or other things intended to form or forming part of the permanent work or temporary housing, hutting, office, stores, etc.,

  • Direct Construction Cost means the sum of the amounts that the Construction Manager actually and necessarily incurs for General Conditions Costs, Cost of the Work and Construction Manager’s Contingency during the Construction Phase as allowed by this Agreement. Direct Construction Cost does not include Pre-Construction Phase Fees or Construction Phase Fees.

  • Pre-Construction Phase Services means the participation, documentation and execution of Contractor’s Pre-Construction Phase deliverables as required by this Agreement and further defined in Article 5.

  • Construction means any physical change or change in the method of operation (including fabrication, erection, installation, demolition, or modification of an emissions unit) which would result in a change in actual emissions.

  • Construction project means the same as that term is defined in Section 38-1a-102.

  • Construction and demolition debris means and includes:

  • Estimated Construction Cost or “ECC” means the amount calculated by Contractor for the total cost of all elements of the Work based on this Agreement available at the time(s) that the ECC is prepared. The ECC shall be based on current market rates with reasonable allowance for overhead, profit and price escalation and shall include and consider, without limitation, all alternates and contingencies, designed and specified by A/E and the cost of labor and materials necessary for installation of Owner furnished equipment. The ECC shall include all the cost elements included in the AACC, as defined above, and shall represent Contractor’s best current estimate of the Guaranteed Maximum Price it will propose for the Project based on the information then available. The ECC shall not include Contractor’s Pre-Construction Phase Fee, A/E’s Fees, the cost of the land and rights-of-way, or any other costs that are the direct responsibility of Owner.