Examples of Public water supply in a sentence
Minimum lot frontage 6.1.2.2.1 Public water and sanitary sewers: 18 metres; In the case of a corner lot, the minimum lot frontage shall be 22 metres; 6.1.2.2.2 Public water supply and private sewage disposal system: 24 metres; 6.1.2.2.3 Private water supply and septic tank: 45 metres.
Factors which should be addressed include, but are not limited to, well depth and construction, radius of influence, hydrogeologic separation of aquifer, preferential pathways, and differing water quality characteristics.f. Public water supply well assessment.
Public water supply for new development shall conform to or exceed the Coordinated Water System Plan for public water systems.
Public water supply uses for human consumption shall be considered the highest priority.
Public water supply laboratories are required to record standardizations and calibrations on a standardized record form or bench sheet.