Project Reference definition

Project Reference. Information related, but not limited to, development projects and assignments to be performed by the Recipient for the Company. The Company possesses competitively valuable Confidential Information (as hereinafter defined) regarding its current products, future products, research and development, and general business operations. Recipient may enter or has entered into a business relationship with the Company and in connection therewith may need to review or use the Company's Confidential Information and Materials or to create new Confidential Information and Materials for the Company. In consideration of the promises and covenants contained in this Agreement and the disclosure of Confidential Information and Materials from the Company to the Recipient, the parties hereto agree as follows:
Project Reference means the reference given to a Project specified in the Contract Data.
Project Reference. Fashion Show Mall Tenant AHU The Landlord and its consultant and contractors do not warrant or guarantee the performance of any selection as it pertains to Tenant comfort. The Tenant is soley responsible for designing and selecting an appropriate system that meets the individual Tenant's unique needs. AHU Controls ------------- The Tenant shall provide the individual AHU controls for maintaining space temperature setpoint by modulating the two-way chilled water control valve(s). Cycling, or On/Off, control is not permitted. The chilled water control valve shall be a Siemens Flowrite VF 599 series with a Flowrite EA 599 series SKB electronic valve actuator. This is a normally closed two-way modulating control valve with equal percentage valve characteristic, sized for a differential pressure of no less than five (5) psi and no more than ten (10) psi across the valve at design flow rate. The valve maintains Class IV leakage rating up to 100-psi pressure differential across the valve. Follow manufacturer's requirements for proper installation. The Landlord furnished fresh air system is sized to provide the minimum required fresh air. Consequently, air-side economizing is not recommended. For AHUs larger than 2,000 cfm, also include smoke detector installed on the supply-side of the AHU for AHU shutdown upon activation. AHU Chilled water cooling coil piping: ------------------------------------------ The piping, fittings, control valve, coil and balancing valve shall be sized for a 16 deg. F delta T. Refer to SECTION V for an AHU chilled water cooling coil piping schematic. The chilled water piping system shall meet the following requirements.

Examples of Project Reference in a sentence

  • The MPTF Office Project Reference Number is the same number as the one on the Notification message.

  • One Project Reference Form is required for each referenced project.

  • A firm will not be permitted to submit on more than one (1) Joint Venture for the same Project Reference Number.

  • A firm will not be permitted to submit a Letter of Interest on more than one (1) Joint Venture for the same Project Reference Number.

  • The Multi-Partner Trust Fund (MPTF) Office Project Reference Number is the same number as the one on the Notification message.

  • NATIONAL FOOD AUTHORITY Regional Office IV Project Reference No. RO4-GOODS-2013-15Procurement of 2013 Second Semester Palay Milling Services in Region IVPhilippine Bidding Documents Procurement of GOODSSection II.

  • PREFERENTIAL PROCURMENT REGULATION 9: IMPLEMENTATION PLAN Employer Project Description Tender Number Project Reference Number 1.

  • Exhibit 7 may be modified for presentation purposes, but must include all requested information; there is no page limit for individual projects; however, the maximum total for all projects is ten pages and no more than one project may be included on any Project Reference Form.

  • A Disadvantaged Business Enterprise (DBE) partici- pation goal is established for the Project Reference Num- ber but no DBE/WBE is identified and no good faith effort is included.

  • Respondent must also provide the information on the Project Reference Form included as Exhibit 7 in this RFP.

Related to Project Reference

  • Cross-reference The statutory provisions on the President and the Executive are found in title 2 of this code. The statutory provisions on the FSM Congress are found in title 3 of this code.

  • Performance References has the meaning set forth for such term in the definition of Derivative Instrument.

  • Terms of Reference (TOR) means the document included in the RFP as Section 5 which explains the objectives, scope of work, activities, tasks to be performed, respective responsibilities of the Client and the Consultant, and expected results and deliverables of the assignment.

  • Trade Reference means a reference concerning the creditworthiness of the Bidder given by another business that extends credit to the Bidder, such as a supplier.

  • Underlying Referencek means the Basket of Shares as set out in item 31(a)

  • Underlying Reference means as set out in §25(a) below.

  • Project Management Report means each report prepared in accordance with Section 4.02 of this Agreement;

  • Project Results means all data and results of the Project.

  • Three-dimensional reference system means a system as described in Appendix 2 to this annex;

  • Terms of Reference (TORs) means the Terms of Reference that explains the objectives, scope of work, activities, and tasks to be performed, respective responsibilities of the Procuring Entity and the Consultant, and expected results and deliverables of the assignment.

  • WTO GPA country construction material means a construction material that—

  • Pre-Construction Phase Services means the participation, documentation and execution of Contractor’s Pre-Construction Phase deliverables as required by this Agreement and further defined in Article 5.

  • Project Record means the separate set of Drawings and Specifications as further set forth in paragraph 4.02A.

  • Acceptance Testing mean the tests, reviews and other activities that are performed by or on behalf of Agency to determine whether the Deliverables meet the Acceptance Criteria or otherwise satisfy the Agency, as determined by the Agency in its sole discretion.

  • Terms of Reference (TOR) means the document included in the RFP as Section 5 which explains the objectives, scope of work, activities, tasks to be performed, respective responsibilities of the Client and the Consultant, and expected results and deliverables of the Assignment/job.

  • Operating Environment means, collectively, the platform, environment and conditions on, in or under which the Software is intended to be installed and operate, as set forth in the Statement of Work, including such structural, functional and other features, conditions and components as hardware, operating software and system architecture and configuration.

  • Construction Phase Services means the coordination, implementation and execution of the Work required by this Agreement, which are further defined in Article 8.

  • Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).

  • Construction material means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

  • Standard reference compendia means the American Medical Association Drug Evaluations, the

  • Caribbean Basin country construction material means a construction material that—

  • Least developed country construction material means a construction material that—

  • Construction materials means any tangible personal property that will be

  • The Works/Project means the works to be executed or done under this contract.

  • the book of reference means the book of reference certified by the Secretary of State as the book of reference for the purposes of this Order;

  • technical specification means, with respect to any Software, the document setting forth the technical specifications for such Software and included in the Statement of Work.