Must Run definition

Must Run means this power plant which is not subjected to Merit Order dispatch principles; MSPDCL shall also ensure deployment of efficient energy management system so as to ensure entire energy generation capability of the Project;
Must Run. FOR RELIABILITY GENERATION
Must Run status means that the concerned power plant has to supply electricity to the grid under all conditions.

Examples of Must Run in a sentence

  • SP 5.2 DESIGNATION OF GENERATING UNIT AS RELIABILITY MUST-RUN The ISO will have the right at any time based upon ISO Controlled Grid technical analyses and studies to designate or disqualify a Generating Unit as a Reliability Must-Run Unit.

  • SP 5.1.2 ANNUAL RELIABILITY MUST-RUN FORECAST - TECHNICAL STUDIES The ISO will perform off-line technical studies, adopt existing procedures developed by PTOs and/or develop new operating procedures to identify the Reliability Must-Run requirements for various levels of system Demand.

  • SP 5.1 PROCUREMENT OF RELIABILITY MUST-RUN GENERATION BY THE ISO SP 5.1.1 ANNUAL RELIABILITY MUST-RUN FORECAST - TECHNICAL EVALUATION On an annual basis, the ISO will carry out technical evaluations based upon historic patterns of the operation of the ISO Controlled Grid and the ISO's forecast requirements for maintaining the reliability of the ISO Controlled Grid in the next year.

  • Page No. 619 SP 5 RELIABILITY MUST-RUN GENERATION SP 5.1 PROCUREMENT OF RELIABILITY MUST-RUN GENERATION BY THE ISO SP 5.1.1 ANNUAL RELIABILITY MUST-RUN FORECAST - TECHNICAL EVALUATION On an annual basis, the ISO will carry out technical evaluations based upon historic patterns of the operation of the ISO Controlled Grid and the ISO's forecast requirements for maintaining the reliability of the ISO Controlled Grid in the next year.

  • PROVIDE SAMPLE CALCULATIONS USING EACH OF THE THREE MUST-RUN OPTIONS FOR EACH OF THE UTILITIES.

  • Distribution services, INCLUDING DISTRIBUTION-RELATED BILLING AND COLLECTION, REQUIRED ANCILLARY SERVICES AND MUST-RUN GENERATING UNITS; AND b.

  • PLEASE DELINEATE THE COSTS AND SPECIFY THE RESPONSIBLE PARTY FOR EACH MUST-RUN GENERATOR WHEN THE MUST-RUN GENERATOR IS (1) OWNED BY A UTILITY AND SCHEDULED THROUGH THE PX, AND (2) SCHEDULED THROUGH A NON-PX SCHEDULING COORDINATOR.

  • The three generation stations and all their units are identified as RMR candidates in the 2002-2003 RELIABILITY MUST-RUN TECHNICAL STUDY OF THE ISO-CONTROLLED GRID.

  • NON-COMPETITIVE SERVICES: [Delivery] (1) DISTRIBUTION SERVICES; (2) REQUIRED ANCILLARY SERVICES, WHICH SHALL INCLUDE SCHEDULING, SYSTEM CONTROL AND DISPATCH SERVICE, AND REACTIVE SUPPLY AND VOLTAGE CONTROL FROM GENERATION SOURCES SERVICE; [Transmission services] (3) MUST-RUN GENERATING UNITS; [Ancillary services] (4) SYSTEM BENEFIT CHARGES; AND (5) DISTRIBUTION-RELATED BILLING AND COLLECTION.


More Definitions of Must Run

Must Run. Status will be provided to Solar Power Projects. In case such eventuality of Back down arises, except for the cases where the Backdown is on account of events like consideration of grid security or safety of any equipment or personnel or other such conditions, the Solar Power Producer shall be eligible for a Minimum Generation Compensation, from the Procurer, in the manner detailed below Duration of Back down Provision for Generation Compensation Hours of Back down during a monthly billing cycle. Minimum Generation Compensation = 100% of [(Average Generation per hour during the month) × (number of backdown hours during the month) × PPA Tariff] Where, Average Generation per hour during the month (kWh) = Total generation in the month (kWh) † Total hours of generation in the month.
Must Run means this power plant which is not subjected to Merit Order dispatch principles; JDA shall also ensure deployment of efficient energy management system so as to ensure entire energy generation capability of the Project;
Must Run means this power plant which is not subjected to Merit Order dispatch principles; USER shall also ensure deployment of efficient energy management system so as to ensure entire energy generation capability of the Project; National Solar Mission or JNNSM shall mean the Xxxxxxxxxx Xxxxx National Solar Mission launched by the Government of India vide resolution No.5/14/2008-P&Cdated 11th January 2010, as amended from time to time. Operating Period shall mean the period commencing from the Commercial Operation Date, until the last day of the Term of this Agreement or date of earlier termination of this Agreement in accordance with Article 2of this Agreement. Open Access Charges shall mean the charges levied by the CTU/ RLDC / STU/ SLDC of the State wherein the Solar Power Project is located for the grant of Open Access as defined in Electricity Xxx 0000 and amended time to time.
Must Run reduce off-take risk: It means utilities, state load dispatch centres, and distribution companies have to prioritize evacuating power from renewable sources.

Related to Must Run

  • Acceptance Test is a test of the Features executed by the Customer to prepare the acceptance.

  • Acceptance Tests means those tests performed during the Performance Period which are intended to determine compliance of Equipment and Software with the specifications and all other Attachments incorporated herein by reference and to determine the reliability of the Equipment.