Examples of Facility Meter in a sentence
If any of the inspections or tests disclose an error exceeding 0.5 percent, either fast or slow, proper correction, based upon the inaccuracy found, shall be made of previous readings for the actual period during which the Facility Meter rendered inaccurate measurements if that period can be ascertained.
Title and risk of loss related to the Product shall transfer from Seller to PGE at the Delivery Point, except that title to Bundled RECs shall transfer to PGE when generated and shall be measured at the Facility Meter.
If the actual period cannot be ascertained, the proper correction shall be made to the measurements taken during the time the metering equipment was in service since last tested, but not exceeding three (3) months, in the amount the Facility Meter shall have been shown to be in error by such test.
PGE shall have the right to periodically inspect, test, repair and replace the Facility Meter, without PGE assuming any obligations under the Interconnection Agreement.
The Facility Meter shall serve as the record source for purposes of calculating, certifying, and auditing Bundled RECs. Seller shall cause the Facility to implement all necessary generation information communications in WREGIS, and report generation information to WREGIS pursuant to a WREGIS-approved meter that is dedicated to the Facility and only the Facility.