Basic Construction definition

Basic Construction shall have the meaning set forth in the Work Letter. Subject to the 17 terms of the Work Letter, the Final Basic Building Plans are (and any amendments thereto shall be) 18 consistent in all material respects with the description of Basic Construction set forth in the Work Letter, 19 it being agreed, however, to the extent there is any conflict between the Final Basic Building Plans and 20 the description of Basic Construction in the Work Letter, the lesser of the obligations imposed upon 21 Landlord by the foregoing items shall govern and control (or, if the foregoing shall not be applicable 22 (i.e., the conflict shall involve different, but not lesser, obligations such as a paint color and the like), then 23 Landlord in its reasonable discretion shall designate which of the foregoing items shall govern and 24 control). It is the intention of Landlord and Tenant that the terms of the prior sentence shall be fully 25 applicable with respect to every reference in this Lease to the Final Basic Building Plans and/or Basic 26 Construction.
Basic Construction of the Building shall mean the structure of the Building as built on the date of this Work Letter and all other improvements, fixtures and facilities constituting a part of the Project.
Basic Construction means a single construction project which is subject to the building code and having an estimated value of less than that specified in Schedule “C” to this by-law.

Examples of Basic Construction in a sentence

  • Section 15.01 If the Premises or any part thereof shall be damaged or rendered Untenantable by fire or other insured casualty and Tenant gives prompt notice thereof to Landlord and this Lease is not terminated pursuant to any provision of this Article, Landlord shall proceed, with reasonable diligence after the collection of the insurance proceeds attributable to such damage, to repair or cause to be repaired such damage to the Basic Construction of the Building.

  • Tenant may substitute material, equipment, and fixtures for those specified for Basic Construction with written consent of Landlord.

  • Basic Construction Funding Terms: The Disbursement Agreement shall provide that FFCA will agree to fund the Development Price in progress payments through the Title Company, and Borrower will agree to complete the improvements as provided therein.

  • Tenant shall pay Landlord the cost to Landlord for such substitute items which is in excess of such items included in Basic Construction.

  • III-14 Basic Construction and Mechanical Systems ..................

  • Basic Construction The disbursement agreement shall provide that FFCA will Funding Terms: agree to fund the Development Price in progress payments through the title company, and Borrower will agree to complete the Improvements as provided therein.

  • Landlord agrees to provide the items of Basic Construction as hereinafter specifically defined (or make allowances as indicated) as more fully set forth in the working drawings to be prepared by Xxxxxx Xxxxxx Architects upon execution of the Lease, subject to the terms and conditions hereinafter provided.

  • Section 14.01 If the Premises or any part thereof shall be damaged or rendered untenantable by fire or other insured casualty and Tenant gives prompt notice thereof to Landlord and this Lease is not terminated pursuant to any provisions of this Article, Landlord shall proceed, with reasonable diligence after the collection of the insurance proceeds attributable to such damage, to repair or cause to be repaired such damage to the Basic Construction of the Premises and Landlord's Work.

  • SECTION 15.01 If the Premises or any part thereof shall be damaged or rendered Untenantable by fire or extended coverage peril and Tenant gives prompt notice thereof to Landlord and this Lease is not terminated pursuant to any provision of this Article, Landlord shall proceed, with reasonable diligence after the collection of the insurance proceeds attributable to such damage, to repair or cause to be repaired such damage to the Basic Construction of the Building and Landlord's Work.

  • Basic Construction Funding Terms: The Disbursement Agreement shall provide that FFCA will agree to fund the Development Price in progress payments through Lawyer's Title Insurance Company, and Borrower will agree to complete the lmprovements as provided therein.


More Definitions of Basic Construction

Basic Construction a one hundred, sixty-two thousand, seven hundred fifty (162,750) square foot general purpose warehouse/cross dock facility, to be constructed by Landlord on the Land, together with paving, landscaping, and driveway entrance, all as more fully described in the Plans and as more fully shown on the Site Plan.

Related to Basic Construction

  • New construction means, for the purposes of determining insurance rates, structures for which the "start of construction" commenced on or after the effective date of an initial FIRM or after December 31, 1974, whichever is later, and includes any subsequent improvements to such structures. For floodplain management purposes, "new construction" means structures for which the "start of construction" commenced on or after the effective date of the floodplain management regulations adopted by a community and includes any subsequent improvements to such structures.

  • The constructional plant means all appliances, tools, plants or machinery or whatsoever nature required in or about the execution, completion or maintenance of the works but does not include materials or other things intended to form part of the permanent work.

  • Commencement of Construction means the commencement of construction of foundation components or elements (such as footings, rafts or piles) for the home.

  • Completion of Construction means the date, as determined by the Division after consultation with the Recipient, that the work of building and erection of the Project is substantially complete.

  • Building construction means any physical activity on the site involved in the erection of a structure, cladding, external finish, formwork, fixture, fitting of service installation and the unloading of plant, machinery, materials or the like.

  • Original construction ’ shall mean the first or initial construction

  • Residential construction means construction on single-family or two-family dwellings occupied or used, or intended to be occupied or used, primarily for residential purposes, and includes real property pursuant to chapter 499B.

  • Cost of Construction means the total cost to Owner of those portions of the entire Project designed or specified by the Design Professional. Cost of Construction does not include the Design Professional's compensation and expenses and Owner's expenses associated with the Project or the cost of other services to be provided by others to the Owner.

  • Start of construction means the date the development permit was issued, provided the actual start of construction, repair, reconstruction, or improvement was within 180 days of the permit date. The actual start means the first placement of permanent construction of the structure such as the pouring of slabs or footings, installation of piles, construction of columns, or any work beyond the stage of excavation, and includes the placement of a manufactured home on a foundation. (Permanent construction does not include initial land preparation, such as clearing, grading and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footings, piers or foundations or the erection of temporary forms; nor does it include the installation on the property of buildings appurtenant to the permitted structure, such as garages or sheds not occupied as dwelling units or part of the main structure. (NOTE: accessory structures are NOT exempt from any ordinance requirements) For a substantial improvement, the actual start of construction means the first alteration of any wall, ceiling, floor, or other structural part of a building, whether or not that alteration affects the external dimensions of the building.

  • Existing construction means any structure for which the "start of construction" commenced before the effective date of the initial floodplain management code or ordinance adopted by the community as a basis for that community's participation in the NFIP.

  • Commenced Construction means (a) all of the following site preparation work is completed: ingress and egress routes exist; the site on which the Project will be located is cleared and graded; there is power service to the site; footings are prepared; and foundations have been poured consistent with purchased equipment specifications and project design; or (b) the following financial commitments have been made: (i) (A) an engineering, procurement, and construction contract (“EPC”) has been executed by all parties and is effective; or (B) contracts (collectively, “EPC Equivalents”) for all of the following have been executed by all parties and is effective: (1) project engineering, (2) procurement of all major equipment, and (3) construction of the Project, and (ii) the cumulative payments made by the Developer under the EPC or EPC Equivalents to the counterparties to those respective agreements is equal to at least thirty (30) percent of the total costs of the EPC or EPC Equivalents.

  • Commence Construction means that an owner or operator has either undertaken a continuous program of construction or has entered into a contractual obligation to undertake and complete, within a reasonable time, a continuous program of construction.

  • Pre-Construction Phase Services means the participation, documentation and execution of Contractor’s Pre-Construction Phase deliverables as required by this Agreement and further defined in Article 5.

  • Erection, construction, remodeling, repairing means all types of work done on a particular building or work at the site thereof in the construction or development of the project, including without limitation, erecting, construction, remodeling, repairing, altering, painting, and decorating, the transporting of materials and supplies to or from the building or work done by the employees of the Contractor, Subcontractor, or Agent thereof, and the manufacturing or furnishing of

  • Direct Construction Cost means the sum of the amounts that the Construction Manager actually and necessarily incurs for General Conditions Costs, Cost of the Work and Construction Manager’s Contingency during the Construction Phase as allowed by this Agreement. Direct Construction Cost does not include Pre-Construction Phase Fees or Construction Phase Fees.

  • Pipeline Construction means a substantial disturbance to agricultural land associated with installation, replacement, removal, operation or maintenance of a pipeline, but shall not include work performed during an emergency. Emergency means a condition where there is clear and immediate danger to life or health, or essential services, or a potentially significant loss of property. When the emergency condition ends, pipeline construction will be in accordance with these rules.

  • Constructional Plant means all appliances or things whatever nature required in or about the execution, completion or maintenance of the works or temporary works (as hereinafter defined) but does not include materials or other things intended to form or forming part of the permanent work or temporary housing, hutting, office, stores, etc.,

  • Construction and demolition debris means and includes:

  • Contribution in aid of construction, as used in this subrule, means a nonrefundable cash payment grossed-up for the income tax effect of such revenue covering the costs of a distribution main extension or service line that are in excess of costs paid by the utility. The amount of tax shall be reduced by the present value of the tax benefits to be obtained by depreciating the property in determining the tax liability.

  • Construction means any physical change or change in the method of operation (including fabrication, erection, installation, demolition, or modification of an emissions unit) which would result in a change in actual emissions.

  • Land disturbing construction activity means any man-made alteration of the land surface resulting in a change in the topography or existing vegetative or non-vegetative soil cover, that may result in runoff and lead to an increase in soil erosion and movement of sediment into waters of the state. Land disturbing construction activity includes clearing and grubbing, demolition, excavating, pit trench dewatering, filling and grading activities.

  • Construction project means the same as that term is defined in Section 38-1a-102.

  • Acquisition and Construction Fund means the fund so designated in, and created pursuant to, Section 502 hereof.

  • Estimated Construction Cost or “ECC” means the amount calculated by Contractor for the total cost of all elements of the Work based on this Agreement available at the time(s) that the ECC is prepared. The ECC shall be based on current market rates with reasonable allowance for overhead, profit and price escalation and shall include and consider, without limitation, all alternates and contingencies, designed and specified by A/E and the cost of labor and materials necessary for installation of Owner furnished equipment. The ECC shall include all the cost elements included in the AACC, as defined above, and shall represent Contractor’s best current estimate of the Guaranteed Maximum Price it will propose for the Project based on the information then available. The ECC shall not include Contractor’s Pre-Construction Phase Fee, A/E’s Fees, the cost of the land and rights-of-way, or any other costs that are the direct responsibility of Owner.

  • Construction and demolition waste means the waste building materials, packaging, and rubble resulting from construction, remodeling, repair, and demolition operations on pavements, houses, commercial buildings and other structures.

  • construction site means a workplace where construction work is being performed;