Water Sampling Station Sample Clauses

Water Sampling Station. Item No. A7 Reference: OPSS.MUNI 401, 441, Contract Drawings Payment shall be made under this Item for the supply of all labour, equipment, and material necessary for the supply and installation of the water sampling station and appurtenances in the location shown on the Contract Drawings or as directed by the Contract Administrator. The Contract price shall include supply and installation of the above grade water sampling station including freeze proof sampling faucet with stainless steel service piping, lockable aluminium housing, copper vent tube and aluminium base. The Contract price shall also include new main stop, 19 mm Municipex service pipe, tracer wire, curb stop, galvanized steel support pipe, galvanized steel standpipe, concrete blocks for support of curb stop and sampling station, cathodic protection, earth excavation, backfill, and compaction. The Contract price shall also include final adjustment of the curb stop to suit the final surface grade.
AutoNDA by SimpleDocs

Related to Water Sampling Station

  • First sampling In the first sampling four lamps are selected at random. The first sample of two is marked A, the second sample of two is marked B.

  • Sampling The Licensee agrees that the Composition is purchased as a “Work Made for Hire” whereby the clearing of any sampled materials is the responsibility of Licensee.

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.

  • Interconnection Point The Service Provider is responsible for connecting to the LFC Network at the Interconnection Point. The LFC may only change an Interconnection Point if a change is necessary to protect the security or integrity of that Interconnection Point in order to maintain the continuity of supply of the Wholesale Services. In the event of any such change:

  • Interconnection Points 8.5.1 The IP of a Party (“Receiving Party”) for Measured Internet Traffic delivered to the Receiving Party by the other Party shall be the same as the IP of the Receiving Party for Reciprocal Compensation Traffic under Section 7.1 above.

  • Project Site The “Project Site” is the place where the Work is being carried on.

  • Excavation If any excavation shall be made upon land adjacent to or under the Building, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter the Premises for the purpose of performing such work as said person shall deem necessary or desirable to preserve and protect the Building from injury or damage and to support the same by proper foundations, without any claim for damages or liability against Landlord and without reducing or otherwise affecting Tenant’s obligations under this Lease.

  • Water Supply The system may or may not meet state and local requirements. It is the right and responsibility of Buyer to determine the compliance of the system with state and local requirements. [For additional information on this subject, request the “Water Supply and Waste Disposal Notification” form.]

  • Calibration The comparison of a measurement system or device of unverified accuracy with a measurement system of known and greater accuracy to detect deviation of the unverified measurement system from required performance specifications (of the unverified measurement system or device) and to quantify all measured values to applicable units of the international system of units.

  • Storage The ordering agency is responsible for storage if the contractor delivers within the time required and the agency cannot accept delivery.

Time is Money Join Law Insider Premium to draft better contracts faster.