Uncompleted structures Sample Clauses

Uncompleted structures. No improvements in the course of being erected or constructed on the Land shall be left without substantial work being carried out for a period longer than two months. Total construction time for erection or construction of the dwelling house to issue of a Certificate of Final Inspection shall not exceed six months from the date of commencement of that construction or such further period as agreed to in writing by the Seller.
AutoNDA by SimpleDocs
Uncompleted structures. No Dwelling shall be permitted to stand in an unfinished condition for longer than six (6) months after commencement of construction. In the event of fire, windstorm, or other damage, no Dwelling shall be permitted to remain in a damaged condition longer than six (6) months. The outside exterior walls and trim shall be completely finished within one hundred eighty (180) days.

Related to Uncompleted structures

  • Other Structures You may use up to 10% of the Coverage A limit of liability for loss by a Peril Insured Against to other structures described in Coverage B. This coverage is additional insurance.

  • BUILDINGS AND STRUCTURES 1. Repair or retrofit of buildings less than 45 years old.

  • Underground Utilities Any required ground digging or subsurface work shall be done in accordance with Chapter 556, Florida Statutes. It shall be the responsibility of CONTRACTOR to have all underground utilities located before any work begins (Sunshine State One Call 0-000-000-0000). The repairs of any damaged underground utilities as a result of the work being performed by CONTRACTOR shall be the responsibility of CONTRACTOR. The proper utility company shall be contacted immediately to expedite the repairs, if damage has occurred. CONTRACTOR will notify the COUNTY and provide a written explanation of the incident within two (2) days of the damage to any underground utilities.

  • Infrastructure Improvements The design, redevelopment and construction and completion of certain infrastructure improvements, including sewer, stormwater, electrical and water main improvements, along with other similar improvements.

  • Elements Defines the individual components under each indicator

  • Structures Airport facilities such as bridges; culverts; catch basins, inlets, retaining walls, cribbing; storm and sanitary sewer lines; water lines; underdrains; electrical ducts, manholes, handholes, lighting fixtures and bases; transformers; flexible and rigid pavements; navigational aids; buildings; vaults; and, other manmade features of the airport that may be encountered in the work and not otherwise classified herein. 10-50 SUBGRADE. The soil which forms the pavement foundation.

  • Subloop Elements 2.8.1 Where facilities permit, BellSouth shall offer access to its Unbundled Subloop (USL) elements as specified herein.

  • Adverse Weather Conditions Except in emergency situations, the Employer shall not require an employee:

  • Outages 9.7.1.1 Outage Authority and Coordination. Interconnection Customer and Transmission Owner may each in accordance with Good Utility Practice in coordination with the other Party and Transmission Provider remove from service any of its respective Interconnection Facilities, System Protection Facilities, Network Upgrades, System Protection Facilities or Distribution Upgrades that may impact the other Party’s facilities as necessary to perform maintenance or testing or to install or replace equipment. Absent an Emergency Condition, the Party scheduling a removal of such facility(ies) from service will use Reasonable Efforts to notify one another and schedule such removal on a date and time mutually acceptable to the Parties. In all circumstances, any Party planning to remove such facility(ies) from service shall use Reasonable Efforts to minimize the effect on the other Parties of such removal.

  • Sub-loop Elements 2.8.1 Where facilities permit, BellSouth shall offer access to its Unbundled Sub-Loop (USL) elements as specified herein.

Time is Money Join Law Insider Premium to draft better contracts faster.