Train Station Sample Clauses

Train Station. Xxxxx Xxxxxxx: Know your emergency contact information In addition to your personal emergency contacts, indicate the numbers for the following agencies nearest to your study abroad and/or travel location(s): City or country’s 911 equivalent; Local Gov’t Visa office: Consulate/Embassy: Police: Fire: Post Office: Translator Service: Hospital: Host Institution International Officer Covid-19 Testing Center: 24hr Insurance Assistance: In addition to your personal emergency contacts, indicate the numbers of your first, second, third contacts in case of an emergency? Person 1:
AutoNDA by SimpleDocs
Train Station i. There is a fold-down section of the ticketing counter for persons who use wheelchairs, but unless it is in the “down” position, it is indistinguishable from the rest of the high counter. Provide signage indicating its availability. ii. The drinking fountain near the entrance to the Café is not accessible to persons who have difficulty bending or stooping, and the door to the café swings into the required clear floor space at the drinking fountain. Provide a drinking fountain that is accessible to people who have difficulty bending or stooping. This can be accommodated by the use of a “hi-lo” fountain; by providing one fountain accessible to those who use wheelchairs and one fountain at a standard height convenient for those who have difficulty bending; by providing a fountain accessible to people who use wheelchairs and a cup dispenser, or by such other means as would achieve the required accessibility for each group of people. Standards § 4.1.3(10)(a). Also, ensure that no door swings into the required clear floor space at any accessible fixture. iii. The door to the Café from the train station requires too much pressure to operate. Provide a door that requires no more than 5 pounds of force to open. Standards § 4.13.11(2)(b). iv. The door to the toilet room vestibule from the Café requires too much pressure to operate. Provide a door that requires no more than 5 pounds of force to open. Standards § 4.13.11(2)(b). v. The center exterior entrance to the museum is not accessible because it contains a step. Provide accessible directional signage with the International Symbol of Accessibility at this entrance indicating the location of the nearest accessible entrance, and provide accessible signage with the International Symbol of Accessibility at all accessible entrances. Standards §§ 4.1.2(7)(c), 4.30.1, 4.30.2, 4.30.3, 4.30.5, 4.30.7.
Train Station. A train station to be developed on the Station Parcel to serve the System.
Train Station. Lateral fiber extending from the termination locations shall be 12ct or greater extending to the main fiber route splice location.
Train Station. Faculty Building Hospital Building Paket 1.1 Rumah Sakit UI Paket 1.1 Rumah Sakit Universitas Indonesia Perbandingan Luasan Area RS UI • MOD = 40.000 m2 • Design = 74.043 m2 Persentasi Kenaikan Luasan = +85% Infrastructure for safety • Radiology wastes • Laboratory wastes • Pharmaceutical wastes • Wastewater treatment Provision for natural disaster • Base isolation • Electricity back-up system: – Solar storage with volume enough for electricity back-up for 7 days to anticipate isolation of hospital from supply system • Space for patient management from disaster of massive scale Building Prize EIA Topography Soil mechanic Orientasi arah earthquakeproof Maintenance & corridor Reaksi dr pondasi Struktur Bawah Struktur Atas Beban hidup & Mati EPIC, signify the traits of ideal engineer: DR. Za-Chiech Moh 22/04/99 E Effective; Efficient; Excellent; Ethical; Enterprising P is Proper; Productive; Punctual; Perfect; Persistent

Related to Train Station

  • Transmission Facilities The NTO owns certain transmission facilities over which the ISO will have day-to-day operational control to maintain these facilities in a reliable state, as defined by the Reliability Rules and all other applicable reliability rules, standards and criteria, and in accordance with the ISO Tariffs, ISO Related Agreements and ISO Procedures (“ISO Operational Control”). These NTO facilities shall be classified as “NTO Transmission Facilities Under ISO Operational Control,” and are listed in Appendix A-1 of this Agreement. The NTO also will be responsible for providing notification to the ISO with respect to actions related to certain other transmission facilities. These facilities shall be classified as “NTO Transmission Facilities Requiring ISO Notification,” and are listed in Appendix A-2 of this Agreement. Transmission facilities may be added to, or deleted from, the lists of facilities provided in Appendices A-1 and A-2 herein by mutual written agreement of the ISO and the NTO owning and controlling such facilities. Currently listed facilities will be posted on the ISO’s OASIS.

  • Merchant Transmission Facilities “Controllable A.C. Merchant Transmission Facilities” shall mean transmission facilities that (1) employ technology which Transmission Provider reviews and verifies will permit control of the amount and/or direction of power flow on such facilities to such extent as to effectively enable the controllable facilities to be operated as if they were direct current transmission facilities, and

  • Interconnection 2.2.10 Startup Testing and Commissioning

  • of Interconnection 2.1.1 Each Party, at its own expense, shall provide transport facilities to the technically feasible Point(s) of Interconnection on Verizon’s network in a LATA selected by ENT.

Time is Money Join Law Insider Premium to draft better contracts faster.