Supplementary Choristers Sample Clauses

Supplementary Choristers. Supplementary Choristers engaged in a production and engaged for a subsequent production may be contracted to attend music rehearsals for the subsequent production in the earlier period (as in Clause 14:01(C)(i) above) and will be paid a minimum of one-sixth (1/6) of the Chorus music preparation rate for each three (3) hour (maximum) call.
AutoNDA by SimpleDocs
Supplementary Choristers. The Engager may engage Supplementary Choristers in accordance with Clause 14:01(B)(i), who are Canadian citizens or permanent residents and who are not already members of another professional performing artists’ association or union (such as, but not limited to, AEA, UDA, ACTRA) as Associate Members as defined in Equity’s Constitution and Bylaws, when engaged under their first COA Engagement Contract. Supplementary Choristers must become Regular Members on their second COA Engagement Contract.

Related to Supplementary Choristers

  • Supplementary Card a card which is issued by the Bank to the client and/or other person nominated by the client and which is linked to the existing card account of the client;

  • Supplementary Labour (a) If the Employer wishes to engage supplementary labour to perform work performed by its Employees under this Agreement, the Employer must first consult in good faith with the affected Employees.

  • Supplementary Conditions That part of the Contract Documents which amends or supplements these General Conditions.

  • Issue of supplementary card We may issue a supplementary card to a person nominated by the basic cardmember and approved by us as a supplementary cardmember, in which event this clause 11, in addition and without prejudice to the other terms and conditions of this agreement, applies. The basic cardmember acknowledges that we may, in our discretion, allow the supplementary cardmember to activate the digital version of his/her supplementary card, prior to receipt of the physical version of such supplementary card. The digital version of the supplementary card (comprising of the digital card credentials), may be used by the supplementary cardmember to perform transactions on the relevant supplementary card. In such event, both basic and supplementary cardholder will be liable for the transactions performed using the digital version of the supplementary card in accordance with this clause.

  • SUPPLEMENTARY INDEX Exhibit A-Local Church Vote Certification Exhibit B-Bill of Sale Exhibit C-Deed(s) Exhibit D-FIRPTA Schedule 3.2-Other Liabilities Schedule 3.4-Financial Statements Schedule 4.3-Subsidiaries Schedule 4.7-Leases & Land Schedule 4.8-Personal Property EXHIBIT A Local Church Certification EXHIBIT B Bill of Sale [Form]

  • Termination of use of supplementary card The basic cardmember is entitled at any time to terminate the use of any supplementary card, and the supplementary cardmember may terminate the use of his supplementary card, at any time in accordance with clause

  • Delivery and Content of Monthly Bills/Supplementary Bills 10.2.1 The SPD shall issue to SECI hard copy of a signed Monthly Xxxx/Supplementary Xxxx for the immediately preceding Month/relevant period based on the issuance of Energy Accounts along with all relevant documents (payments made by SPD for drawal of power, payment of reactive energy charges, Metering charges or any other charges as per guidelines of SERC/CERC, if applicable. Each Monthly Xxxx shall include all charges as per this Agreement for the energy supplied for the relevant Month based on Energy Accounts issued by RPC or any other competent authority which shall be binding on both the Parties. The Monthly Xxxx amount shall be the product of the energy as per Energy Accounts and the Applicable Tariff. Energy drawn from the grid will be regulated as per the regulations of respective State the Project is located in.

  • Supplementary Terms Other Contributions

  • Supplementary cardmember’s liability The supplementary cardmember is liable only for that part of the total outstanding balance in respect of his supplementary card; he is not liable in any way for such part of the total outstanding balance in relation to the card issued to the basic cardmember and any supplementary card issued to any other supplementary cardmember.

  • SUPPLEMENTARY PREAMBLES For preambles see "Specifications of materials and methods to be used - PW 371" GLAZING TO STEEL WITH PUTTY 4mm Obscure safety glass: 1 Panes not exceeding 0,1 m2 m2 3 Carried Forward to Summary of Section No. 3 R Section No. 3 SMD1 Bill No. 11 GLAZING BVI CONSULTING ENGINEERS Amount Item No SECTION 3 Quantity Rate Amount BILL NO. 12 PAINTWORK SUPPLEMENTARY PREAMBLES For preambles see "Specifications of materials and methods to be used - PW 371" ON FIBRE-CEMENT Prepare and brush to remove all loose contaminations, apply one coat primer and two coats PVA emulsion paint: 1 On fascias and barge boards m2 6 ON WOOD Undercoat and minimum 2 coat gloss enamel: 2 On doors (Internal) m2 3 3 On doors (External) m2 7 ON METAL Undercoat and minimum 2 coat gloss enamel: 4 On door frames m2 1 5 On gates (Measured over the full flat area of both sides) m2 8 6 On gutters and down pipes m 10 Spot prining defects in prime surface with zinc chromate primer and apply one universal undercoat and two coats EPWP, golden brown gloss enamel paint on steel: 7 On windows with burglar bars m2 3 Carried Forward to Summary of Section No. 3 Section No. 3 SMD1 Bill No. 12 PAINTWORK BVI CONSULTING ENGINEERS R SECTION SUMMARY - SMD1 Bill No Page No 1 EARTHWORKS 61 2 CONCRETE,FORMWORK AND REINFORCEMENT 63 3 MASONRY 66 4 WATERPROOFING 67 5 ROOF COVERINGS 69 6 CARPENTRY AND JOINERY 71 7 IRONMONGERY 73 8 METALWORK 74 9 PLASTERING 75 10 PLUMBING AND DRAINAGE 78 11 GLAZING 79 12 PAINTWORK 80 Carried to Final Summary Section No. 3 SMD1 BVI CONSULTING ENGINEERS Amount R Item No SECTION 4 Quantity Rate Amount BILL NO.1 EARTHWORKS (PROVISIONAL) SUPPLEMENTARY PREAMBLES For preambles see "Specifications of materials and methods to be used - PW 371" SITE CLEARANCE 1 Digging up and removing rubbish, debris, vegetation, xxxxxx, shrubs,xxxx and trees not exceeding 200mm girth, etc. m2 73 2 Stripping average 100mm thick layer of top soil and stockpiling on site m2 73 EXCAVATION,FILLING, ETC Excavation in earth not exceeding 2m deep: 3 Trenches m3 18 4 Pit m3 27 5 For aprons thickenning m3 4 Extra over trench and hole excavations in earth for excavation: 6 Soft rock m3 49 7 Hard rock m3 49 Extra over all excavations for carting away: 8 Surplus material from excavations and/or stock piles on site to a dumping site to be alocated by the Contractor m3 35 Carried Forward Section No. 4 MD3 Bill No. 1 EARTHWORKS BVI CONSULTING ENGINEERS R Brought Forward R Risk of collapse of excavations: 9 Sides of trench and hole excavation not exceeding 1,5m deep. m2 82 Keeping excavations free of water: 10 Keeping excavations free of water other than subterranean water Item Earth filling obtained from the excavations and/or prescribed stock piles on site compacted to 93% ModAASHTO density: 11 Under floors, steps, pavings, etc. m3 7 12 Backfilling to trenches, holes, etc. m3 9 Compaction of surfaces: 13 Compaction of ground surface under floors etc including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 93% Mod AASHTO density m2 25 14 Compaction of ground surface to pits etc including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 93% Mod AASHTO density m2 20 15 Compaction of ground surface to aprons etc including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 93% Mod AASHTO density m2 44 Prescribed density tests on filling: 16 Modified AASHTO Density tests No 5 SOIL POISONING Carried Forward R Section No. 4 MD3 Bill No. 1 EARTHWORKS BVI CONSULTING ENGINEERS Brought Forward R Soil insecticide: 17 Under floors etc including forming and poisoning shallow furrows against foundation walls etc, filling in furrows and ramming. m2 25 18 To bottom of concrate aprons m2 44 19 To bottoms and sides of trenches, etc. m2 69 Carried Forward to Summary of Section No. 4 R Section No. 4 MD3 Bill No. 1 EARTHWORKS BVI CONSULTING ENGINEERS R Amount

Time is Money Join Law Insider Premium to draft better contracts faster.