Prior to Commissioning Sample Clauses

Prior to Commissioning. OMNIconnect may terminate this Agreement prior to completing the Installation and Commissioning if it is determined that the Services cannot be provided to the Customer for any reason. Upon any termination of this Agreement by OMNIconnect, the Customer will be refunded any amounts that they have paid for the Set-up Fee and/or Monthly Service Fee.
AutoNDA by SimpleDocs
Prior to Commissioning. The Ship Canal WQ Project, SPU and DNRP will document all operating assumptions, and any relevant agreements concerning upstream and downstream flow impacts.
Prior to Commissioning. The SLP will notify UU of their intent to sample and pressure test via the SL07 form a minimum of 5 days prior to the pressure test and sampling being undertaken and send the form to the local UU Project Engineer to allow our representative to witness the activity. United Utilities Water Pipe Disinfection Table Rule set Pipe size (PE – od) Pipe type Pressure test Disinfection Disinfection testing Time limit for connection to be made Action if time limit exceeded 1 25mm and 32mm Communication and Supply 12 bar visual test using hand pump on undrilled top tee (IGN) Flush with mains water (disinfect 1 hour at 50 ppm if contamination is suspected) Not required 14 calendar days after main has been filled with potable water Re-flush with mains water 2 63mm Communication Top-tee - 12 bar visual test using a hand pump on undrilled top tee Branch – test with main (IGN) 1 hour at 50ppm of chlorine (communication pipes <100m can be disinfected with the main - BSEN 805) Certificate of disinfection required - bacteriological testing not normally required. (BSEN 805 14 calendar days after main has been filled with potable water Re-flush with mains water 3 Supply 1.5 x max operating pressure (WFR, BS6700) 4 > 63mm Communication and Supply Type 2 with logger (WRC) 1 hour at 50ppm Satisfactory bacteriological result required 14 calendar days after main has been filled with potable water Re-flush with mains water and re-sample as per United Utilities Water’s mains hygiene procedure 5 >=63mm Main Type 2 with logger (WRC) 20ppm after 16 hours has elapsed as per United Utilities Water’s mains hygiene procedure Satisfactory bacteriological result required 14 calendar days after main has been filled with potable water Re-flush with mains water and re-sample as per United Utilities Water’s mains hygiene procedure  At the end of the disinfection procedure the pipe must be flushed thoroughly with mains water and sealed.  If at any point contamination is suspected or the pipe work has been modified then the disinfection procedure must be repeated along with any testing.  The 14 calendar days rule ensures that, for ongoing construction work, pre-disinfected pipes are installed in a timely manner. It also ensures consistency of message where the supply and communication pipe are one length of pipe and are being installed and tested at the same time.

Related to Prior to Commissioning

  • Commissioning Commissioning tests of the Interconnection Customer's installed equipment shall be performed pursuant to applicable codes and standards. If the Interconnection Customer is not proceeding under Section 2.3.2, the Utility must be given at least ten (10) Business Days written notice, or as otherwise mutually agreed to by the Parties, of the tests and may be present to witness the commissioning tests.

  • TESTING AND COMMISSIONING 24 Allow for a Lump Sum for testing and commissioning of the entire electrical installation, including the provision of Compliance Certificate. Item Carried to Collection R Section No. 4 Electrical Installation (Provisional) Bill No. 1 Electrical Installation COLLECTION Total Brought Forward from Page No. Carried to Final Summary 76 77 R Amount FINAL SUMMARY Section No Page No 1 Preliminaries 26 2 Alterations (Provisional) 30 3 External Works (Provisional) 73

  • Preconstruction Phase Services Preconstruction Phase Services shall mean all services described in Article 3.1, and any similar services described in the Request for Proposals, including such similar services as are described in the Construction Manager at Risk’s Response to the Request for Proposals to the extent they are accepted by Owner, but excluding any Early Work. Early Work shall be considered part of Construction Phase Services.

  • Decommissioning The expenditure for Decommissioning will be estimated on the basis of technical studies undertaken by the Contractor, to be agreed by the National Petroleum Agency, as part of each Field Development Program and revised as necessary.

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • Contract Completion The Contractor shall achieve Contract Completion, as the term is defined in this Agreement, within 60 calendar days of Substantial Completion.

  • Building Commissioning Services The Owner may provide as a part of its testing services the Building Commissioning services involving the project’s HVAC and exhaust systems, temperature control systems, fire detection and alarm systems, emergency power and lighting system, fire suppression system, security locks and security locking control systems, food service equipment (if applicable), and laundry equipment (if applicable). In the event the Using Agency’s Program specifies additional commissioning services, the Owner shall procure such services as well. The Owner, through its Executive Administrator, may engage an independent Commissioning Authority. It is the intent of this Article that the Commissioning Authority enforce the requirements mentioned herein and certify that the systems and equipment listed all function properly prior to the initiation of each final inspection.

  • Project Completion Part 1 – Material Completion

  • Construction Completion The related Construction shall have been completed substantially in accordance with the related Plans and Specifications, the related Deed and all Applicable Laws, and such Leased Property shall be ready for occupancy and operation. All fixtures, equipment and other property contemplated under the Plans and Specifications to be incorporated into or installed in such Leased Property shall have been substantially incorporated or installed, free and clear of all Liens except for Permitted Liens.

  • Work Scheduling Except at the request of an affected employee, no employee shall have the number of hours they are normally scheduled to work reduced as the result of the use of non-permanent employees such as, but not limited to: seasonal, intermittent, student interns, interns, interim, established term, or temporary employees, due to the performance of such employee’s duties by the nonpermanent employee.