Other Debris Sample Clauses

Other Debris. Other debris includes but is not limited to tires, small motorized equipment, electronic waste, propane tanks, and petroleum products. As part of recovery efforts, Contractor shall monitor TDSR site(s) development and restoration. Field monitors will report directly to County’s Debris Management Coordinator or designee if the following are observed:
AutoNDA by SimpleDocs
Other Debris. Eligible debris that is not exclusively Vegetative Debris, which may contain Vegetative Debris, construction and demolition debris, and other types of bulk debris, but not Unauthorized Debris.

Related to Other Debris

  • DEBRIS Contractor shall be responsible for the prompt removal of all debris which is a result of this contractual service.

  • Demolition The Lessor shall remove existing abandoned electric, telephone, and data cabling and devices, as well as any other improvements or fixtures in place, to accommodate the Government’s requirements. Any demolition of existing improvements that is necessary to satisfy the Government’s layout shall be done at the Lessor’s expense.

  • Demolition work (a) As of 1 October 2020 where Employees are directly performing demolition works that would require a demolition permit that allows the performance of such work, they will receive the amount of $8.35 per hour or the site allowance, whichever is the greater. This allowance will be adjusted annually in accordance with CPI (All Groups, Melbourne) movements measured in the twelve month period ending the previous December quarter effective as of 1 March 2021, rounded to the nearest 5 cents.

  • Garbage The Concessionaire will contract directly with the service provider for adequate dumpster capacity and wildlife resistance. The Department must pre- approve the location of dumpsters and frequency of pick-ups. The Concessionaire will provide recycle bins for use by Park visitors.

  • Cleaning 8.1 CONTRACTOR shall, at his own expenses, at all times keep the premises free from accumulation of debris, waste materials, and rubbish, and at the completion of the work, he shall remove his tools and equipment and all surplus materials, debris, waste material, and rubbish and shall leave the premises in a neat and clean condition. If CONTRACTOR does not attend to such cleaning immediately upon request, OWNER shall have the right to have this work done by others and deduct the cost therefore from the payment due CONTRACTOR hereunder.

  • Rubbish Please note that the blue top bin is for recycling and all other rubbish should be placed in black bin liners in the other bin for collection. Bins should be put out on Sunday evenings for an early Monday morning collection. Any bin that has not been put out will be the responsibility of the Guest to dispose of the rubbish. The Council will not collect any loose rubbish that is not inside a black bin liner. See above note re dog mess and nappies.

  • Cleaning Up 4.15.1 Before commencement of any on-site activities, Contractor is required to prepare and submit to the Project Manager a Construction Site Waste Reduction Plan. A sample plan is available at: xxxx://xxx.xxx.xxxxx.xx.xx/dec/wastediv/recycling/CandD.htm . Failure to comply with this provision or a failure to comply with the plan itself will result in withholding of general conditions’ money from the contractor’s monthly requisition until Contractor has rectified the situation and is in full compliance with these provisions.

  • Decorations The only acceptable form of affixing items to walls is the use of white sticky tack, and must be removed by the Resident prior to move out, or be subject to removal charges. Spikes, hooks, screws, tacks or nails or any permanent adhesion type tape shall not be put into or on the walls or woodwork, ceilings, furnishings, doors or windows of any part of the Residence. Residents may not decorate the outside of their room door unless for special occasions approved by the Manager. Strings of indoor lights should not be in direct contact with any flammable materials and should not be left on while the room is unattended.

  • Maintenance and Repair – Line Sharing 3.6.1 C.M. shall have access for repair and maintenance purposes to any Loop for which it has access to the High Frequency Spectrum. If C.M. is using a BellSouth owned splitter, C.M. may access the Loop at the point where the combined voice and data signal exits the central office splitter via a bantam test jack. If C.M. provides its own splitter, it may test from the collocation space or the Termination Point.

  • Road Surfaces (1) Grade, shape, crown, and/or outslope surface and shoulders.

Time is Money Join Law Insider Premium to draft better contracts faster.