Meter Maintenance Sample Clauses

Meter Maintenance. All electric metering equipment, [Gas Meters, submeters, and other Gas metering equipment], whether owned by Seller or by a third party, installed on [Seller’s side of the Gas Delivery Point and] Seller’s side of the Electrical Delivery Point, shall be operated, maintained and tested by and/or on behalf of Seller in accordance with Prudent Electrical Practices, in the case of the electric metering equipment, [and in accordance with American Gas Association and American National Standards Institute standards in the case of the Gas Meters, Gas submeters, and Gas metering equipment]; provided that if the test is conducted by the interconnecting utility or the Transmission Provider, testing shall be conducted in accordance with the procedures and the standards generally applied by such utility or the Transmission Provider (as applicable). [For facilities other than Gas-fired facilities, omit the bracketed language.]
Meter Maintenance. All electric metering equipment, Gas Meters, submeters, and other Gas metering equipment, whether owned by Seller or by a third party, which are installed on Seller’s side of the Gas Delivery Point or Seller’s side of the Electrical Delivery Point, as applicable, shall be operated, maintained and tested by and/or on behalf of Seller in accordance with Prudent Electrical Practices, in the case of the electric metering equipment, and, in the case of the Gas Meters, Gas submeters, and Gas metering equipment, in accordance with American Gas Association and American National Standards Institute standards; provided that if the electric metering equipment test is conducted by the interconnecting utility or the Transmission Provider, testing shall be conducted in accordance with the procedures and the standards generally applied by such utility or the Transmission Provider (as applicable).
Meter Maintenance. Interconnector will perform scheduled meter accuracy testing and calibration of its metering facilities pursuant to Interconnector’s standard practices, procedures and methods associated with the installed measurement equipment. SoCalGas or its duly authorized representative(s) shall have the right to be present at the time of any installing, reading, cleaning, changing, repairing, inspecting, testing, calibrating, or adjusting done in connection with Interconnector’s measuring equipment used in measuring deliveries from Interconnector to SoCalGas. Interconnector shall give written, fax, or electronic mail notice to SoCalGas prior to calibrating and testing. Except in the event of an emergency or operational necessity, such notice shall be given to SoCalGas at least three (3) business days prior to any such activity. The records from such measuring equipment shall remain the property of Interconnector, but upon request Interconnector shall make available to SoCalGas (and its representatives) copies of any such records and charts, together with calculations therefrom, for inspection and verification during normal business hours. Interconnector will perform unscheduled and episodic tests of its measuring equipment upon SoCalGas’ request, where such tests can be operationally executed to verify metering integrity/accuracy. Interconnector will perform such testing in a reasonable timeframe. If, as a result of any testing, it is determined that there has been a combined (meter an transmitters) error in measurement greater than one percent (1%), the Parties will adjust all prior periods back to the period where it can be mutually determined and agreed upon that the errors commenced. If such an agreement cannot be reached, the calculated combined error amount shall be applied to ½ of the period extending back to the date of the last test/calibration where the combined meter error was shown to be less than one percent (1%). If any SoCalGas request for special calibration shows that the combined measurement error does not exceed one percent (1%), then the cost of such requested special calibration shall be borne by SoCalGas. In the event that any test of the metering equipment yields a combined measurement error greater than one percent (1%), then the cost of such requested special test and subsequent calibration shall be borne by Interconnector. In the event that there is a conflict between this provision and Interconnector’s FERC approved tariff, Interconnector’s...
Meter Maintenance. All electric metering equipment and submeters, whether owned by Seller or by a third party, which are installed on Seller’s side of the Electrical Delivery Point, as applicable, shall be operated, maintained and tested by and/or on behalf of Seller in accordance with Prudent Electrical Practices; provided that if the electric metering equipment test is conducted by the interconnecting utility or the Transmission Provider, testing shall be conducted in accordance with the procedures and the standards generally applied by such utility or the Transmission Provider (as applicable).
Meter Maintenance. Said metering facilities required for the purposes of this Agreement shall be provided and maintained in accordance with Good Utility Practice by the owner, at the owner’s cost and expense.
Meter Maintenance. Meters installed by EESI shall be maintained throughout the Contract Term in accordance with all applicable Rules, including periodic testing and calibration; provided that EESI shall not be responsible for any costs or expenses arising from or caused by: (a) acts or omissions of SBC, its affiliates, or any owner or tenant of the Facility where the Meter is installed, or any other third party, (b) service upgrades at a Facility (including costs associated with troubleshooting calls and Meter installation, replacement or upgraded Meters, manual meter reading, or account re-implementation or re-setup); (c) an electric service account being reclassified from a <50kW account to a >50kW account; (d) maintenance, repair, or replacement of any Competitive Supplier Meter; and (e) conversion or other reconfiguration of any Meters by a Utility or Competitive Supplier after the Contract Term.
AutoNDA by SimpleDocs
Meter Maintenance. Prearranged Maintenance of TXUN meters (Gas & Electric), services & time switches providing supply to customers' premises. INCLUDES: o removing, inspecting, testing and re-installation of meters, time switches, overhead and underground services and associated equipment.
Meter Maintenance. Customer shall ensure the maintenance of its Meters and Water Meters and associated data acquisition equipment. Customer shall collect data in accordance with generally accepted engineering practices. Notwithstanding, City may also collect data of Flow from either the Meters or Water Meters at any time and in its sole discretion.
Meter Maintenance. 12.1. The Meters shall be supplied with a warranty cover of 10 years from the date of installation of the meters (“Warranty Period”). This warranty covers all manufacturer defects and related problems which shall be replaced during the warranty period at no cost to EKEDP or the Customer, subject to clause 12.3 (c) below.
Time is Money Join Law Insider Premium to draft better contracts faster.