Independent Power Production Sample Clauses

Independent Power Production. An enterprise of another Party may acquire, establish, and/or operate an electricity generating facility for independent power production (IPP) in Mexico. Electricity generated by such a facility for sale in Mexico shall be sold to CFE and CFE shall purchase such electricity under terms and conditions agreed to by CFE and the enterprise. Where an IPP located in Mexico and an electric utility of another Party consider that cross-border trade in electricity may be in their interests, each relevant Party shall permit these entities and CFE to negotiate terms and conditions of power purchase and power sale contracts. The modalities of implementing such supply contracts are left to the end users, suppliers and CFE and may take the form of individual contracts between CFE and each of the other entities. Each relevant Party shall determine whether such contracts are subject to regulatory approval.
AutoNDA by SimpleDocs

Related to Independent Power Production

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Initiating Interconnection 4.1 If ENT determines to offer Telephone Exchange Services and to interconnect with Verizon in any LATA in which Verizon also offers Telephone Exchange Services and in which the Parties are not already interconnected pursuant to this Agreement, ENT shall provide written notice to Verizon of the need to establish Interconnection in such LATA pursuant to this Agreement.

  • California Independent System Operator Corporation a California nonprofit public benefit corporation having a principal executive office located at such place in the State of California as the CAISO Governing Board may from time to time designate (the “CAISO”).

  • Independent Evaluation Buyer is an experienced and knowledgeable investor in the oil and gas business. Buyer has been advised by and has relied solely on its own expertise and legal, tax, title, reservoir engineering, environmental and other professional counsel concerning this transaction, the Properties, the value thereof and title thereto.

  • Independent Entity 17.10.1 The SPD shall be an independent entity performing its obligations pursuant to the Agreement.

  • Capacity Interconnection Rights Pursuant to and subject to the applicable terms of the Tariff, the Interconnection Customer shall have Capacity Interconnection Rights at the Point(s) of Interconnection specified in this Interconnection Service Agreement in the amount of 550 MW.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • Independent Entities Business Associate and Covered Entity are independent entities, and this Agreement will not establish any relationship of partnership, joint venture, employment, franchise, or agency between Business Associate and Covered Entity. Neither Business Associate nor Covered Entity will have the power to bind the other or incur obligations on the other Party’s behalf without the other Party’s prior written consent, except as otherwise expressly provided in this Agreement.

  • Required Coverages For Generation Resources Of 20 Megawatts Or Less Each Constructing Entity shall maintain the types of insurance as described in section 11.1 paragraphs (a) through (e) above in an amount sufficient to insure against all reasonably foreseeable direct liabilities given the size and nature of the generating equipment being interconnected, the interconnection itself, and the characteristics of the system to which the interconnection is made. Additional insurance may be required by the Interconnection Customer, as a function of owning and operating a Generating Facility. All insurance shall be procured from insurance companies rated “A-,” VII or better by AM Best and authorized to do business in a state or states in which the Interconnection Facilities are located. Failure to maintain required insurance shall be a Breach of the Interconnection Construction Service Agreement.

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where InterGlobe has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to InterGlobe. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for InterGlobe (e.g. hairpinning):

Time is Money Join Law Insider Premium to draft better contracts faster.