Going Forward Sample Clauses

Going Forward. The Pharmacopeia Group and PDD agree to execute, acknowledge and deliver such further instruments and do all other such acts as may be necessary or appropriate to effect the purpose and intent of this Agreement.
AutoNDA by SimpleDocs
Going Forward. 25.9.1 ERIS Election and future Evaluation for CRIS Whenever a Developer elects to interconnect taking ERIS only, that Developer may, at any later date, ask the ISO to evaluate the Developer’s Large Facility or Small Generating Facility for CRIS by including the Developer’s Large Facility or Small Generating Facility in (1) the next Open Class Year and the Deliverability Study to be conducted for that Class Year; or (2) the next open Expedited Deliverability Study.
Going Forward. 25.9.1 ERIS Election and future Evaluation for XXXX Whenever a Developer elects to interconnect taking ERIS only, that Developer may, at any later date, ask the ISO to evaluate the Developer’s Large Facility or Small Generating Facility for XXXX by including the Developer’s Large Facility or Small Generating Facility in (1) the next Open Class Year and the Deliverability Study to be conducted for that Class Year; or (2) the next open Expedited Deliverability Study.
Going Forward. X. XXXX Election and future Evaluation for XXXX 25.9.1 ERIS Election and future Evaluation for XXXX X. No Developer Responsibility for Future Upgrades 25.9.2 No Developer Responsibility for Future Upgrades 1 25.9.2.1 2 25.9.2.2 X. Xxxx of XXXX Rights 25.9.3 Term of XXXX Rights
Going Forward all purchased or leased (new) equipment will have air conditioning and all units shall be maintained. It is understood that any leased (used) mobile equipment that does not have air conditioning can only be leased for a maximum of one (1) month during the period of May to August. Such will apply to mobile equipment with closed cabs. The Company will consider the purchase of climatic controls on all new equipment.
Going Forward. There are numerous branches to consider in moving forward with this study. More analysis with the two dimensional case would be the first step. FreeFEM++ is a powerful tool that can be utilized more fully in ways not touched upon in this study. A next step could be to follow in the footsteps of the 1D experimentation in the 2D case. Additionally, we could consider more the methods necessary to analyze American options. American options are generally more prevalent than European and more interesting because of their nature. The literature suggests heavy limitations on the analysis of American options with these methods, but this realm could be explored further. Perhaps we could repeat Xxxxxxxx’x work [2] and
Going Forward. 53 apply the concepts of the research of this paper to see if there were ways to better interpret results. Another consideration moving forward would be to step out of the theoretical spectrum and consider real world values. In this way we could observe how the implications of this study hold outside of the theoretic construct. Finally, as an additionally step it would be interesting to try a similar code in FreeFEM3D and observe the results with three assets. Appendix A Subrountines
AutoNDA by SimpleDocs
Going Forward. ▀ Submit Facility Plan to DEM - April 2014 ▀ DEM Review and Finalize - August 2014 ▀ Design and PermittingSeptember 2014 to December 2015Bidding and Construction - January 2016 to April 2017 000000.00 10 Comparison Cost ▀ DEM – $7M1 From DEM Report - Plan for Managing Nutrient Loadings to RI Waters - estimated the cost for Xxxxxx’x upgrades for nitrogen at $4.6M in 2005 ▀ East Greenwich – $10M1 Similar size facility to Xxxxxx upgraded in 2006 for $7M ▀ Warwick - $14M1 Warwick was $35M2 for 7.7 million gallon per day facility in 20042– equivalent to approximately $9M on an equivalent flow basis 1 – Cost projected to 2017 using Engineering News Record – Construction Cost Index 2 – From the Warwick Sewer Authority website 000000.00 11 Funding ▀ The State Revolving Fund (SRF) ▀ Co-managed by the R.I. Clean Water Finance Agency (RICWFA) & DEM ▀ Provides below market rate loans for wastewater facilities ▀ Every major treatment facility upgrade in RI to date has received funding through this program 000000.00 12 Questions and Comments
Going Forward. 25.9.1 ERIS Election and future Evaluation for XXXX Whenever a Developer elects to interconnect taking ERIS only, that Developer may, at any later date, ask the NYISO to evaluate the Developer’s Large Facility or Small Generating Facility for XXXX by including the Developer’s Large Facility or Small Generating Facility in the Open Class Year and the Deliverability Study to be conducted for that Class Year.
Going Forward. 1) Midwest is currently in the process of locating and purchasing mineral leases in locations contiguous with the Property and its surrounding area. Any acquired leases are explicitly not included in the Original Agreement or the Option.
Time is Money Join Law Insider Premium to draft better contracts faster.