Auxiliary Power Unit Sample Clauses

Auxiliary Power Unit. Number of APU Hours Since Last Heavy Shop Visit: __________ hours Date accomplished __________ Hot Section Inspection: Interval: ________________________ Time Since: ________________________
AutoNDA by SimpleDocs
Auxiliary Power Unit. (a) The APU will be serviceable in accordance with the requirements of the Maintenance Manual as evidenced by Maintenance Manual tests and inspections.
Auxiliary Power Unit. Number of Flight Hours/APU Hours (as applicable) since New:
Auxiliary Power Unit. Make And Manufacturer’s Total APU APU Hours since Total Cycles since Model Serial Numbers Hours APU Heavy Repair Cycles APU Heavy Repair
Auxiliary Power Unit. On Condition Time Since Last APU _____ Heavy Shop Visit: Date of Last APU ______ Heavy Shop Visit: SCHEDULE 2 TO ACCEPTANCE CERTIFICATE (RETURN) Discrepancies (Append additional pages as required and initial each such page):
Auxiliary Power Unit. The APU shall have just completed a borescope inspection and shall meet all air outputs and temperature limitations under load in accordance with the Maintenance Program and the Manufacturer’s maintenance manual, and any discrepancies discovered in such inspection, which exceed the APU manufacturer’s in-service limits, shall be corrected at Sublessor’s expense. The APU shall have not more than the Minimum APU Limit.
Auxiliary Power Unit. With respect to the Aircraft, the auxiliary power unit (“APU”) will have [****]% of the expected time under the Maintenance Program between gas path refurbishments under the Maintenance Program [****] (any such visit, an “APU Performance Restoration Visit”) remaining until the next APU Performance Restoration Visit under the Maintenance Program as measured by Lessee’s historical mean time between APU Performance Restoration Visits as determined by Lessee (“APRV”) for APUs of the same make and model as the subject APU operating on aircraft in Lessee’s fleet as measured by APU hours [****]; provided that Lessee may return the APU with less than [****] subject to paying the APU Performance Restoration Visit Adjustment Amount (if any) [****]
AutoNDA by SimpleDocs
Auxiliary Power Unit. APU Make: Model: S/N: Date of Mfg: Total Time: (Hrs) (Cyc) APU Times Are Recorded By: o APU Clock or o A/C Ratio : Time Time Between Overhaul: (Hrs) (Cyc) Time @ Last Hot Section Refurbishment: (Date) (Hrs) (Cyc) Time @ Last Overhaul: (Date) (Hrs) (Cyc) Time @ Last Shop Visit: (Date) (Hrs) (Cyc) Work Scope:
Auxiliary Power Unit. Serial Total Hours/Cycles Number Hour/Cycles TTSV TTSOH to Next Limit
Auxiliary Power Unit. On Condition --------------------- Time Since Last APU Heavy Shop Visit: ____________ Date of Last APU Heavy Shop Visit: ____________ SCHEDULE 2 TO TECHNICAL ACCEPTANCE CERTIFICATE (DELIVERY) Discrepancies (Append additional pages as required and initial each such page): ------------- FOR: ALASKA AIRLINES, INC. FOR: AMERICAN TRANS AIR, INC. By By ----------------------- ----------------------- Title Title ----------------------- ----------------------- Date Date ----------------------- -----------------------
Time is Money Join Law Insider Premium to draft better contracts faster.