100% Submittal Sample Clauses

100% Submittal. The A/E shall submit the completed QA/QC Plan along with the latest marked-up documents (plans, specifications, etc.) necessary to ensure that a thorough review and coordination have been completed. SPA 2 ADDITIONAL REQUIREMENTS
AutoNDA by SimpleDocs
100% Submittal. The Engineer shall address any comments from the 90% submittal and update, as required, items submitted previously. The 100% submittal shall include Schematic Plan/Profile, Cross Sections, Typical Sections, an Opinion of Probable Construction Costs and a Design Summary Report sufficient for a 100% submittal. Form1002 which explains Design Exceptions shall be submitted by the Engineer, if there are known Design Exceptions. DocuSign Envelope ID: 0EF7DD01-5DEF-492D-AF48-72F6373D49D2 DocuSign Envelope ID: 973D3771-56AD-4A37-8E90-25E408E93E1A The Engineer shall confirm the number of copies required prior to each meeting or submittal.
100% Submittal. Project Related
100% Submittal. The Consultant shall continue refinement of the 90% signal removal plans, technical special provisions and cost estimates to the 100% level.
100% Submittal. The Consultant shall continue refinement of the 90% signing and striping plans, technical special provisions and cost estimates to the 100% level.
100% Submittal. The Consultant shall continue refinement of the 90% illumination plans, technical special provisions and cost estimates to the 100% level.
100% Submittal. The Consultant shall continue refinement of the 90% roadway plan and profile, typical section and roadway detail plans, technical special provisions and cost estimates to the 100% level.
AutoNDA by SimpleDocs
100% Submittal. The Consultant shall continue refinement of the 90% traffic control plans, technical special provisions and cost estimates to the 100% level.
100% Submittal. The Consultant shall continue refinement of the 90% retaining wall detail plans, technical special provisions and cost estimates to the 100% level.
100% Submittal. The Consultant shall continue refinement of the 90% planting plans, technical special provisions and cost estimates to the 100% levels submitted with the Final PSE package .
Time is Money Join Law Insider Premium to draft better contracts faster.